The background film, about one minute, without narration: Dawn: the stone ring and its tower on a wooded hill, mirrored in a still lake beyond wildflowers. The approach: a country road through farm fields toward the low ring. The gates: stone piers and open iron gates, an orchard walk beside a canal. From above: the ring around its garden court, with moats, greenhouses and a lake. The garden court inside the ring, planted and in use. The glass gallery along the wall, with families looking out over the lake. The tropical atrium against the stone halls. A greenhouse in snow, glowing and full of tomatoes. The warm moat steaming beside the wall, a path kept clear of snow. Skaters on the frozen lake at sunrise. Night under the Milky Way, a few warm lights on the water. Natural sound: birds, wind, water and footsteps. No narration.
A concept for American digital infrastructure · Designed in Indiana
Not a data center. A data conservatory.
The Limestone Data Conservatory is digital infrastructure designed to take nothing from its neighbors: its own power, no new power lines, no public water for cooling and no land taken by eminent domain. It never has to wait in line for the grid, the bottleneck now holding back new computing across America. Its waste heat is meant to grow food all year.
Built for what follows.
Start with what matters to you.
- I live or farm where data centers are proposedYour water, your power bill, your land and what the Conservatory is designed to give back.
- I serve in state or county governmentA siting standard that asks for no public water, grid capacity, land or money.
- I need computing capacityPowered halls in a stone ring, with power made on site instead of waiting in a utility’s queue.
- I am an accredited investorHow investors would take part, and how to request the offering documents.
- Show me how it worksFive design decisions, each one removing a reason to say no.
- I report on energy and technologyStatus and figures first, then the letters, the founders and how to reach them.
At a glance.
- Status
- A design concept. No site is under contract and no binding vendor agreement is in place. All figures are planning-level estimates.
- What it does
- It does the work of a data center, housing the computers that run AI and other computing, inside a single ring of Indiana limestone designed to take nothing from its neighbors.
- Size
- A ring about 600 feet across on roughly seven acres: eight hall segments around a garden court, half in the earth and half in daylight.
- Phase One
- Two of eight segments; about 40 MW of machine load and about 30 MW of recoverable heat.
- Power
- Made on site. Phase One: natural gas with storage. Phase Two: an advanced small reactor, once a design is selected and licensed. A standby utility tie for construction and backup only.
- Water
- A sealed cooling loop with dry heat rejection; no public water for cooling.
- Money
- Designed to ask for no public money and no tax abatements; the project intends to pay full property taxes on every acre it owns.
- Who
- Sarah Janisse Brown, designer; Charles Yi, developer; Zach Duke, convener. Sponsored by Kodesh Partners, LLC. Contact the founders.
The concept
The objections became the design brief.
America needs far more computing, and the places asked to host it have learned to say no. Queues for grid power run for years. New transmission lines cross family farms. Cooling water competes with towns and farms. Both sides of that fight are right about something.
The Conservatory was designed in the room where data centers are opposed. Sarah Janisse Brown sat through county open houses beside families who had been told a high-voltage line would cross their land, and she noticed that every complaint traced back to a design choice. Most campuses rely on the grid because buying power is simpler than making it, need new lines because the grid has to reach them, and release their heat because nothing nearby is built to use it.
So she reversed each choice. The result is designed to give builders the capacity they need while removing the objections neighbors raise most.
What the ordinary price tag leaves out
An ordinary campus imports what it does not own.
The queue
Years of waiting for grid capacity before the first megawatt is served.
The corridor
Miles of new high-voltage towers on permanent easements, which can be taken by condemnation when families refuse.
The water
Large volumes of water drawn from wells, rivers or town systems, among the most common triggers of organized opposition.
The rates
A load that large becomes a rate case, and a rate case becomes a story about the neighbors’ bills.
The heat
Nearly all of the site’s heat, released into the air instead of put to use.
The end
A building fitted to one generation of machines, which may need rebuilding for the next.
The design
Five decisions. Each one removes a reason to say no.
The machines live inside a single ring of limestone: eight hall segments around a garden court, half bedded in the earth and half standing in daylight, with a tower above the vault. Around it, the land goes back to work as farm and food forest, with room to open as parkland in a later phase where a site allows.
01 · Power
Generated on site, behind the meter.
What is designed
Power in two phases, made on the property. Phase One is natural-gas generation with storage, designed to run the Conservatory without drawing on the grid. Phase Two would place an advanced small reactor of about 50 megawatts of electricity (MWe) in a vault built during Phase One, once a design is selected and licensed. A standby utility connection carries construction power and emergency backup only, not the day-to-day operating load.
What it removes
The interconnection queue for operating power, new transmission corridors and the condemnation that comes with them, and any operating load on the grid that serves the neighbors’ homes.
02 · Water
One sealed loop. No public water for cooling.
What is designed
Direct liquid cooling on a sealed circuit. Heat crosses to the landscape only through metal-plate heat exchangers, so the two waters never mix. Dry heat rejection and, where the site’s rainfall and catchment allow, a rain-fed lake held as thermal and drought reserve. The lake and moat are open water: they evaporate, overflow in wet years and steam on cold mornings, while the loop itself withdraws nothing. Water for drinking and sanitation comes from a separate, conventional supply.
What it removes
Cooling water drawn from wells, rivers or town systems, cooling-tower plumes, and competition with farms and homes for water in a drought.
03 · Heat
The heat is meant to grow food.
What is designed
Warm water from the halls cascades from its highest use to its lowest: a tropical atrium, winter greenhouses, an aquaponic fishery in the moat and a walk kept clear of snow, before it returns, cooled, to the loop.
What it removes
Cooling-tower plumes, and much of the heat an ordinary campus throws away. The warmth is meant to grow food through an Indiana winter.
04 · Land
One ring, not a sprawl.
What is designed
The ring is about 600 feet across on roughly seven acres. It is designed to be built once and filled over time: Phase One puts machines in two of its eight segments, and the rest would hold workshops, greenhouse bays and classrooms until needed. The acreage around the ring stays green: farm, food forest and prairie, with grounds that could open as a public park in a later phase.
What it removes
Farmland given over to a spread of separate buildings. With no new transmission corridor, there is no corridor to condemn; how natural gas reaches the site without easements is an open question below.
05 · Stone
Built to outlast the machines inside it.
What is designed
Indiana limestone, from the quarries that built Indiana University, set by Indiana trades. Plain, generous stone rooms, sized to take generation after generation of hardware without being rebuilt, with the carving saved for the gates, passages and tower.
What it removes
The short life of a building designed around one generation of machines. The technology turns over; the building does not.
Phase One, at planning level
Two segments first. Six to grow into.
Phase One fills two of the ring’s eight segments. Later phases add halls and generation only as demand and permits allow.
- 28of 8
- Hall segments filled with machines in Phase One.
- ~40MW
- Machine load in about 50,000 square feet of first halls.
- ~30MW
- Low-grade heat recoverable for buildings, greenhouses and walks.
Design commitments
- 0
- Cooling water drawn from public sources
- 0
- Acres taken by eminent domain
- 0
- Tax abatements asked
Planning-level estimates, to be confirmed in a feasibility phase. Zero figures are design commitments, not measured results. Phase One generation is natural gas with storage; Phase Two adds an advanced small reactor once selected and licensed.
Who it serves
Designed so every side of the hearing can say yes.
Data center fights usually end with someone losing. Here is what each side asks for, and how the design answers.
If you need more computing
Capacity designed not to wait in a utility’s queue or depend on a contested transmission line, with direct liquid cooling and halls sized for generation after generation of hardware.
If you have fought data centers
No cooling water from your supply, no operating load on your grid, no land taken by eminent domain and, where a site can open to the public in a later phase, a park instead of a fence.
If you own land
No eminent domain and no new transmission towers across your farm.
If you care about water and the land
No cooling water drawn from rivers or aquifers, waste heat put to work and the land around the ring kept as farm, prairie and forest. Phase One runs on natural gas; its emissions are an open question, printed below.
If you pay the bills
No tax abatements, no public money and no operating load on the grid behind your electric rates.
If you care about America’s lead
American computing on American ground, designed not to wait on the grid or a contested line.
For neighbors
A neighbor designed to give back.
The Conservatory is designed to be the place a county photographs for the front of its visitor guide.
What it is designed never to do
- Draw cooling water from your well, river or town system.
- Draw its operating power from the grid that serves your home.
- Take anyone’s land by eminent domain.
- Raise cooling-tower plumes.
- Ask the county for a tax abatement.
What it is designed to give back
- Greenhouses growing food straight through winter, on heat an ordinary campus throws away.
- A walk kept clear of snow by recovered heat, and lighting designed for dark skies.
- Grounds designed to open to the public in a later phase, where a site allows: a lake and trails, orchards, a farm market, and an education campus where schools, universities and farm youth programs learn beside a working farm.
- The machines and the power stay behind their own secure wall, whatever opens around them.
Still to prove for neighbors: the Phase One gas plant’s emissions and noise, and how gas reaches the site without easements. Both are set out under open questions.
From a letter by Autumn Sojka
This plan offers solutions for the strongest concerns we have in Morgan County.”
From a letter written in September 2026 about the original concept. It is not an endorsement of any site, plan or investment.
The grounds
Walk the grounds.
From the gates to the night sky: the full concept, in photoreal renderings made from Sarah Janisse Brown’s drawings, the same views as the film.
Renderings of the full concept as designed, not photographs of a built project. Public access to the grounds would come in a later phase, where a site allows.
Where it stands
What is designed, and what remains to prove.
The Conservatory is at concept stage: a design with planning-level figures and artist’s concept plates. No site is under contract and no binding vendor agreement is in place. These questions decide whether it proceeds, and they are printed here on purpose.
The power pathway
The Phase One plant and fuel supply, selection and licensing of a Phase Two reactor, who owns and operates generation behind the meter, the delivery schedule, and funded plans for spent fuel and eventual decommissioning.
Fuel and the gas plant
How natural gas reaches the site without easements or eminent domain, and the Phase One generators’ emissions, noise and cooling water.
Public money and the grid tie
Confirming that “no public money” holds through any reactor cost-share, and that the project pays the full cost of its standby utility service.
Site and hydrology
A parcel where stone, catchment and a site-specific water balance all work on their own merits, including whether rain alone can fill the lake and loop, confirmed by a feasibility study.
The heat and farm model
Sizing heat recovery against greenhouse and aquaculture demand, and an operator that runs the farm as a business rather than an amenity.
Capital and covenants
Who owns the plant, the ring and the land, and how the public commitments are made binding on every future owner.
Tenants and timing
Who leases the first halls, on what terms, and when Phase One could be built.
A proposal that hides its open items cannot be underwritten. Every figure here is an invitation to sharpen it.
For state and county leaders
A category to invite, not defend.
Most data center fights are about what the project takes from the public. The Conservatory is designed to take nothing, which gives a state or county something rare: a siting standard it can champion.
Asks for nothing public
No public water for cooling, no grid capacity for operations, no eminent domain, no public money and no tax abatements. The project intends to pay full property taxes on every acre it owns, from the first day.
Builds local
Indiana limestone, Indiana quarries and Indiana trades and, where the site allows, an education campus that trains people to run the next century’s infrastructure.
Adds capacity, not load
Its operating power is its own, so it brings computing to the state without adding operating load to the grid residents and employers rely on. A standby utility tie carries construction power and backup only.
Commitments in writing
The public commitments are intended to be written into the project company’s documents; how to make them binding on every future owner is one of the open questions.
A template, not an exception
A standard the state could adopt and invite by name, for campuses that draw no public water for cooling and no grid capacity for operations.
The land, kept working
Beyond the ring, the land stays farm, food forest and prairie, designed so that, where a site allows, the grounds can open to the public in a later phase.
From a letter by Micah Beckwith
Hoosiers aren’t against the future. They want a future that respects them.”
“Economic development and stewardship do not have to be enemies.”
Both letters were written in September 2026 about the original concept. Neither endorses any site, plan or investment.
For tenants
Powered halls that do not wait on the grid.
The Conservatory is planned as a wholesale campus: the project company is to build the ring and supply its power, and technology companies lease powered halls inside it.
What is leased
Plain stone halls with power, liquid-cooling water and fiber brought to the rack rows. Tenants bring their own machines; rack density is set when a lease is signed, not in advance.
Power
Generated on site, behind the meter, so a lease does not wait in a utility’s interconnection queue. A standby tie covers construction and backup.
Water and heat
Direct liquid cooling on a sealed loop, no cooling water drawn from public sources, and waste heat put to work. Tenants who report water use and heat reuse would report against a design that draws no public cooling water and puts its heat to work; measured figures come with operation.
What Phase One offers
About 40 MW of machine load in about 50,000 square feet of first halls, in two of the ring’s eight segments. Later halls follow demand.
Behind its own wall
The halls and the power sit behind their own secure wall, apart from any grounds that open to the public.
Still to prove
The site, fiber, the Phase One plant and its schedule, and lease terms, all among the open questions.
For investors and institutions
From concept to a project ready to build.
Accredited investors may be offered a passive interest in a fund. The fund holds an interest in the project company, which is to own and develop the Conservatory. The company’s first work is securing a site, permits, engineering, power and the agreements that make it ready to build. Terms, structure and timing appear only in the offering documents.
Inputs under its own control
Power generated and water managed on the property, designed to reduce exposure to interconnection calendars, utility rate cases and drought curtailment. In exchange it takes on fuel-supply and generation risk, set out under open questions.
Built for the hearing room
Where hearings and litigation set schedules, local acceptance matters. The design answers the objections raised most often; whether it earns support will be tested site by site.
Phased by design
The ring is built once and filled over time. Phase One fills two of eight segments; later phases add halls and generation only as demand and permits allow.
A building that outlives its hardware
Plain stone halls sized to accept generation after generation of equipment. Machines are replaced on their own cycle; the building is designed to remain.
Public commitments, in writing
The public commitments are intended to be written into the project company’s documents and made binding on future owners; how is one of the open questions.
Ready for what comes next
The halls are designed to host new classes of computing as they mature, including quantum systems. The case for the Conservatory does not depend on them.
The Conservatory is sponsored and managed by Kodesh Partners, LLC. Nothing on this website is an offer. Any investment is offered only through confidential offering documents, to accredited investors where permitted by law, and every investor’s accredited status is verified before admission. Terms, structure and timing appear only in those documents. Development of this kind carries substantial risk, including the risk of total loss; the principal open items are set out under open questions.
Request the offering documents
Offering documents are available only to accredited investors. By requesting them, you represent that you are an accredited investor as defined in Rule 501(a) of Regulation D. Each investor’s status is verified before any investment is accepted. Requests go to [email protected].
Who would build it
The designer, the developer and the convener.
-
Sarah Janisse Brown
Founder and Chairwoman
Sarah designed the Conservatory and owns the concept. She grew up on Florida’s Space Coast, homeschooled by her mother, the oil painter whose painting of the concept appears on this page, and by her father, a retired Air Force chief master sergeant who worked on the space shuttle’s surfaces as a NASA technician.
She designed a hydroponic farm at thirteen, planted a food forest at fifteen, built a stone cottage with her own hands by thirty, and founded a publishing company that has put more than 360 titles into homes across the country, which taught her to explain hard things plainly. She has spent 2026 listening to Hoosiers about data centers at county meetings across the state. The Conservatory is her answer.
-
Charles Yi
Chief Executive Officer
Charles built his career taking large, mixed-use projects from site control through construction for government, civilian and military clients around the world: data centers, resorts and the infrastructure under them, in regulated settings where the permit is as hard as the pour. As chief executive of EXP Development he has led acquisitions and development across continents.
He reviewed the Conservatory as a developer before joining it and judged that the stone, the supply chain and the below-grade power concept are buildable, subject to a feasibility study. He calls bringing the first one into the world the work of the next thirty years.
-
Zach Duke
President
Zach was raised in Bargersville, Indiana, in the family of Duke Homes, Johnson County builders since 1986, so he knows what a building costs to do right. For eight years he led strategic growth for organizations up to multi-billion-dollar scale: capital campaigns, nationwide marketing and long-range planning.
An international speaker and leadership coach for two decades, he has done humanitarian work in more than forty countries, and he and his wife run a classical school. He is the Conservatory’s convener, the one who gets the right people to the table and keeps them there. A husband and father of five, he brings the capital relationships and the patience a fifty-year project requires.
Consulting engineer
Dr. David W. Hearnsberger
David is a veteran of the U.S. Navy nuclear submarine program, where he was responsible for reactor safety. He holds a Ph.D. in nuclear engineering from Texas A&M University and brings more than 35 years of experience, including Department of Energy nuclear work and small modular reactor programs seeking Nuclear Regulatory Commission approval. His work centers on heat transfer in reactors and data centers, and he co-founded Nanexa LLC.
He reviewed the Conservatory as an independent engineer before joining the project as a consultant, and called it “a conceptually terrific place to start.”
Kodesh Partners, LLC, owned by entities controlled by the three founders, sponsors the Conservatory and manages its project company.
The legacy
The computing is for us. The stone is for them.
Fifty years from now, the machines installed today will be long retired. Down one road, what remains is a building past its use and towers standing over somebody’s soybeans. Down the other, the computers inside the stone have been replaced several times, as planned, while the building stays in use: an orchard on its fourth generation of apples, a market that still opens on Saturday mornings and, where the site allows, a lake where children learn to swim.
Built for what follows.
Contact
Write to the founders.
For officials, neighbors, partners, the press and investors. Choose a topic below to start your message, or write directly.
- A briefing for officialsState, county and local leaders.
- A question from a neighborWater, power, land, noise, the site.
- PressInterviews, facts and imagery.
- Investors and institutionsOffering documents, for accredited investors.
- Partners and tenantsEnergy, construction, computing, farming.
- Send me updatesA note when there is news worth sharing.
- Anything elseAnything not covered above.